Provided on site coordination of multiple contractors across three buildings, transitioning from a Multiplex site through tenant fit-out and into an operational precinct. The property includes medical offices, F&B venues and a Marriott hotel. Murdoch Square was developed by Hesperia, and designed by Hassell.
This iconic tower by Wilkinson Eyre Architects opened as scheduled in December 2020 despite Covid-19 complications. Client side project management of all activities coordinating designers, consultants, Lend Lease, and Crown operations for the public spaces including restaurants, bars, casino, pools, ballroom, spa, retail and staff facilities.
The gold standard of luxury hotels in Perth, Crown Towers opened in December 2016 after 30 months of construction, architecture by YWS, building by Multiplex. Client side project management of structure, facade and interior spaces comprising ballrooms, lobby, bars, restaurants, gaming salons and spa.
Design and construction of this complicated facade coordinated sloped glazing, aluminium paneling,
various shading systems, and unique marble clad extrusions to form a veil around the building as described by architect Chris Wilkinson.
290 rooms required a refresh and remodel with a minimum of downtime to hotel operations. With detailed program management the rooms and corridors were transformed and handed back progressively over just 18 weeks, minimising impact to the business.
Bringing together a combination of complex geometry requiring detailed 3D modelling, 396 individual custom light blades, DMX control and design of unique audio and video content to enable various shows to play for seasonal events and different times of the day.
The interior design vision for a translucent prismatic resin wall created a unique challenge to manage. This was resolved working with a surf board craftsman using custom fabrication techniques to achieve the light transmission required.
Built in front of an operating casino on the Las Vegas Strip, this beach club/night club project required strict program management and was completed in 5 months on a double shift program to meet client requirements.
Design and construction of a boardwalk and water taxi pontoon for the Barangaroo Development Authority, capable of mooring luxury yachts, in the busy Darling Harbour with Sydney Ferries passing close by.
Events Space - Crown Perth
1/7
Copyright © 2024 Moon Project Management - All Rights Reserved.
Powered by GoDaddy
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.